Jerome Guillet
Jerome Guillet
I currently assist projects at early stage, regarding large motor applications. As the optimum of the whole is not equal to the sum of local optima, the aim is to optimize Customer solution in a global approach. It widely includes electrical distribution considerations, motor specifications and application requirements, and concerns normal conditions as well as fault situations.
Since 2015, I had grown my expertise as part of Motor Management Competency Center team (M2CC), and made analysis with EMTP-ATP transient software. I also developed calculus tools and trainings around the subject.
Articles

Harmonics in industry: A difficult to apprehend common issue, but not a fatality
- 4 min read
- Jerome Guillet

How to estimate electrical network stress during large motor starting in pre-design phase
- 2 min read
- Jerome Guillet

Avoid electrical network stress during large motor starting using simplified calculations at design stage
- 2 min read
- Jerome Guillet

Power Distribution and Management
3 safety measures for motors with individual power factor correction
- 3 min read
- Jerome Guillet
Bloggers you may also like
Leandro do Carmo Costa
Global MV Offer Launch Leader
Most recent post: Breathe Easy: Pure Air Innovations Tailored for Medium-Voltage Operators
Vikas Trivedi
Solution Architecture and Consultant Leader
Most recent post: Reimagining Customizations in favor of Extensible Commercial-Off-the-Self (COTS) Solutions in the Move to the ArcGIS Utility Network
Lynette Lyddane
Sr. Product Manager - Software
Most recent post: Get flexibility without the price tag through smarter utility network data conversions