Avelino De Oliveira

I have been working for 23 years in the same company. This organization has changed a name 3 times (Merlin Gerin, MGE UPS Systems and Schneider Electric) and I have taken 3 different jobs (R&D engineer, Power Systems Expert and Multi-Technology Senior Architect). I made different products “STS, Galaxy 3000 and Galaxy 5000 U.S." and take a responsibility for the execution of Power System studies, measurement, technical training, analyze of the issues, realize of audits and design an optimized architecture.
3 min read
What is the Optimal Voltage for 630kW Motors with VSD?

What is the Optimal Voltage for 630kW Motors with VSD?

4.4K views 3 0 78
3 min read

All Motors Contribute to the Main Busbar Short-Circuit, Reality or Dream?

16.9K views 5 0 1.2K